Mud Lake - Benton County (GRE) substation interconnection queue

2 active projects totaling 552.8 MW in the MISO queue.

2 MISO queue filings name Mud Lake - Benton County (GRE) as the point of interconnection, all in Benton County, MN.

2active projects
552.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
J4132 Not reported 230 303.8 Solar Active
J3275 Not reported 230 249 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.