MISO queue ID J4103

Queue request J4103 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW battery project in Trinity County, TX, according to Berkeley Lab’s queue data file. The filing names ONALASKA as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2029.

Queue IDJ4103
Project nameNot reported
Status (as published)Active
SubstationONALASKA
Point of interconnectionONALASKA
CountyTrinity
StateTX
VoltageNot reported
Capacity150 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2029-06-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

ONALASKA substation: 2 requests in the MISO queue, 1 active totaling 150 MW.

Queue IDProjectMWResourceStatus
J3455Not reported250SolarWithdrawn

Trinity, TX: 3 requests in the MISO queue, 2 active totaling 250 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityEAST TEXAS ELECTRIC COOPERATIVE, INC.
ClusterDPP Cycle Pending South
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-10-06

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first