Substation Scout

Trinity, TX interconnection queue

2 active projects totaling 250 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
250active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3455 Not reported n/r 250 Solar Withdrawn
J4103 Not reported n/r 150 Battery Active
J4124 Not reported 138 100 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first