MISO request J4093

MISO queue ID J4093

Queue request J4093 was listed in the MISO interconnection queue at the end of 2025 as a 400 MW battery project in Mason County, MI, according to Berkeley Lab’s queue data file. The filing names PERE MARQUETTE as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2030.

Queue IDJ4093
Project nameNot reported
Status (as published)Active
SubstationPERE MARQUETTE
Point of interconnectionPERE MARQUETTE
CountyMason
StateMI
VoltageNot reported
Capacity400 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2030-06-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

PERE MARQUETTE substation: 2 requests in the MISO queue, 2 active totaling 500 MW.

Queue IDProjectMWResourceStatus
J2392Not reported100BatteryActive

Mason, MI: 17 requests in the MISO queue, 13 active totaling 1,905 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP Cycle Pending East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-10-06

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.