Substation Scout

PERE MARQUETTE substation interconnection queue

2 active projects totaling 500 MW in the MISO queue.

2 MISO queue filings name PERE MARQUETTE as the point of interconnection, all in Mason County, MI.

2active projects
500active MW
2total filed
Queue IDProjectkVMWResourceStatus
J4093 Not reported n/r 400 Battery Active
J2392 Not reported 138 100 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first