Mason, MI interconnection queue
13 active projects totaling 1,905 MW in the MISO queue, plus 4 with terminal status (shown grayed).
13active projects
1,905active MW
17total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J4093 | Not reported | n/r | 400 | Battery | Active |
| J3282 | Not reported | 345 | 297 | Solar | Active |
| J2668 | Not reported | 138 | 225 | Solar | Active |
| J2670 | Not reported | 345 | 223 | Solar | Active |
| G854 | Not reported | 138 | 150 | Wind | Withdrawn |
| J2669 | Not reported | 138 | 140 | Solar | Active |
| J2392 | Not reported | 138 | 100 | Battery | Active |
| J2534 | Not reported | 138 | 100 | Solar | Withdrawn |
| J3007 | Not reported | 138 | 100 | Battery | Active |
| G774 | Not reported | 138 | 70 | Wind | Withdrawn |
| J226 | Not reported | n/r | 70 | Battery | Operational |
| J227 | Not reported | n/r | 70 | Battery | Operational |
| J228 | Not reported | n/r | 70 | Battery | Operational |
| J229 | Not reported | n/r | 70 | Battery | Operational |
| J230 | Not reported | n/r | 70 | Battery | Active |
| J231 | Not reported | n/r | 70 | Battery | Operational |
| J3744 | Not reported | 138 | 15 | Gas | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.