Substation Scout

MISO request J4039

MISO queue ID J4039

Queue request J4039 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW solar project in Montgomery County, IN, according to Berkeley Lab’s queue data file. The filing names Cayuga - Frankfort as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2030.

Queue IDJ4039
Project nameNot reported
Status (as published)Active
SubstationCayuga - Frankfort
Point of interconnectionCayuga - Frankfort 230.0kV
CountyMontgomery
StateIN
Voltage230 kV
Capacity200 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2030-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cayuga - Frankfort substation: 3 requests in the MISO queue, 1 active totaling 200 MW.

Queue IDProjectMWResourceStatus
J1966Not reported200WindWithdrawn
H026Not reported150WindWithdrawn

Montgomery, IN: 22 requests in the MISO queue, 4 active totaling 700 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDUKE ENERGY INDIANA
ClusterDPP Cycle Pending Central
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-06-13

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.