Substation Scout

Cayuga - Frankfort substation interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3 MISO queue filings name Cayuga - Frankfort as the point of interconnection, all in IN.

1active projects
200active MW
3total filed
Queue IDProjectkVMWResourceStatus
J1966 Not reported 230 200 Wind Withdrawn
J4039 Not reported 230 200 Solar Active
H026 Not reported 230 150 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first