Substation Scout

Montgomery, IN interconnection queue

4 active projects totaling 700 MW in the MISO queue, plus 18 with terminal status (shown grayed).

4active projects
700active MW
22total filed
Queue IDProjectkVMWResourceStatus
J754 Not reported 345 303.6 Wind Withdrawn
J2038 Not reported 230 300 Wind Withdrawn
J313 Not reported n/r 201 Wind Withdrawn
G605 Not reported 138 200 Wind Withdrawn
G906 Not reported 230 200 Wind Withdrawn
G949 Not reported 138 200 Wind Withdrawn
J004 Not reported 230 200 Wind Withdrawn
J1780 Not reported n/r 200 Solar Active
J2664 Not reported 345 200 Solar Withdrawn
J3689 Not reported n/r 200 Battery Withdrawn
J4039 Not reported 230 200 Solar Active
J714 Not reported 230 200 Wind Withdrawn
J1815 Not reported 138 180 Solar Withdrawn
J642 Not reported 230 175 Solar Withdrawn
J828 Not reported 138 151.8 Wind Withdrawn
J1782 Not reported 230 150 Solar Active
J1783 Not reported 230 150 Solar Active
J2000 Not reported 230 150 Solar Withdrawn
J2919 Not reported 230 142.6 Wind Withdrawn
J261 Not reported 138 100 Wind Withdrawn
J492 Not reported 69 20 Solar Withdrawn
J2564 Not reported 138 18.9 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first