MISO request J3947

MISO queue ID J3947

Queue request J3947 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW battery project in Shelby County, IL, according to Berkeley Lab’s queue data file. The filing names 7FARADAY - 7PANA as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 30, 2030.

Queue IDJ3947
Project nameNot reported
Status (as published)Active
Substation7FARADAY - 7PANA
Point of interconnection7FARADAY - 7PANA 345.0kV
CountyShelby
StateIL
Voltage345 kV
Capacity200 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2030-09-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

7FARADAY - 7PANA substation: 2 requests in the MISO queue, 2 active totaling 450 MW.

Queue IDProjectMWResourceStatus
J2973Not reported250SolarActive

Shelby, IL: 13 requests in the MISO queue, 7 active totaling 1,275 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN TRANSMISSION COMPANY OF ILLINOIS
ClusterDPP Cycle Pending Central
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-03-25

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.