Substation Scout

Shelby, IL interconnection queue

7 active projects totaling 1,275 MW in the MISO queue, plus 6 with terminal status (shown grayed).

7active projects
1,275active MW
13total filed
Queue IDProjectkVMWResourceStatus
G500 Not reported n/r 710 Gas Withdrawn
J3521 Not reported n/r 350 Wind Active
J1702 Not reported 345 300 Wind Withdrawn
J2724 Not reported 345 300 Battery Withdrawn
J3901 Not reported 138 300 Wind Active
J1837 Not reported 138 200 Wind Withdrawn
J2049 Not reported n/r 200 Wind Active
J3947 Not reported 345 200 Battery Active
J2384 Not reported 138 125 Solar Active
J3671 Not reported 138 120 Solar Withdrawn
G623 Not reported n/r 60 Wind Withdrawn
J2376 Not reported 138 60 Battery Active
J3818 Not reported 138 40 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first