Substation Scout

7FARADAY - 7PANA substation interconnection queue

2 active projects totaling 450 MW in the MISO queue.

2 MISO queue filings name 7FARADAY - 7PANA as the point of interconnection, all in IL.

2active projects
450active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2973 Not reported 345 250 Solar Active
J3947 Not reported 345 200 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first