Substation Scout

MISO request J3895

MISO queue ID J3895

Queue request J3895 was listed in the MISO interconnection queue at the end of 2025 as a 199.7 MW wind project in Muskegon County, MI, according to Berkeley Lab’s queue data file. The filing names KENOWA - LUDINGTON as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2028.

Queue IDJ3895
Project nameNot reported
Status (as published)Active
SubstationKENOWA - LUDINGTON
Point of interconnectionKENOWA - LUDINGTON 345.0kV
CountyMuskegon
StateMI
Voltage345 kV
Capacity199.7 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2028-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

KENOWA - LUDINGTON substation: 3 requests in the MISO queue, 3 active totaling 659.7 MW.

Queue IDProjectMWResourceStatus
J2567Not reported240BatteryActive
J2001Not reported220SolarActive

Muskegon, MI: 14 requests in the MISO queue, 7 active totaling 949.7 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP Cycle Pending East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-02-07

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner