MISO request J2567

MISO queue ID J2567

Queue request J2567 was listed in the MISO interconnection queue at the end of 2025 as a 240 MW battery project in Oceana County, MI, according to Berkeley Lab’s queue data file. The filing names KENOWA - LUDINGTON as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 1, 2025.

Queue IDJ2567
Project nameNot reported
Status (as published)Active
SubstationKENOWA - LUDINGTON
Point of interconnectionKENOWA - LUDINGTON 345.0kV
CountyOceana
StateMI
Voltage345 kV
Capacity240 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2025-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

KENOWA - LUDINGTON substation: 3 requests in the MISO queue, 3 active totaling 659.7 MW.

Queue IDProjectMWResourceStatus
J2001Not reported220SolarActive
J3895Not reported199.7WindActive

Oceana, MI: 9 requests in the MISO queue, 4 active totaling 470 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP-2022 East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.