Muskegon, MI interconnection queue
7 active projects totaling 949.7 MW in the MISO queue, plus 7 with terminal status (shown grayed).
7active projects
949.7active MW
14total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J1614 | Not reported | 138 | 250 | Solar | Active |
| J1522 | Not reported | 345 | 200 | Solar | Withdrawn |
| J3486 | Not reported | 138 | 200 | Battery | Withdrawn |
| J3895 | Not reported | 345 | 199.7 | Wind | Active |
| J1362 | Not reported | 345 | 150 | Solar | Withdrawn |
| J3682 | Not reported | 138 | 150 | Solar | Active |
| J647 | Not reported | 138 | 147.4 | Solar | Withdrawn |
| J609 | Not reported | 115 | 136 | Wind | Withdrawn |
| J1375 | Not reported | 138 | 100 | Solar | Active |
| J1587 | Not reported | 138 | 100 | Solar | Active |
| J906 | Not reported | 345 | 100 | Wind | Withdrawn |
| S1081 | Surplus; J1375 | 138 | 100 | Battery | Active |
| S1082 | Surplus; J1587 | 138 | 50 | Battery | Active |
| J1406 | Not reported | 345 | 25.2 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.