Substation Scout

Muskegon, MI interconnection queue

7 active projects totaling 949.7 MW in the MISO queue, plus 7 with terminal status (shown grayed).

7active projects
949.7active MW
14total filed
Queue IDProjectkVMWResourceStatus
J1614 Not reported 138 250 Solar Active
J1522 Not reported 345 200 Solar Withdrawn
J3486 Not reported 138 200 Battery Withdrawn
J3895 Not reported 345 199.7 Wind Active
J1362 Not reported 345 150 Solar Withdrawn
J3682 Not reported 138 150 Solar Active
J647 Not reported 138 147.4 Solar Withdrawn
J609 Not reported 115 136 Wind Withdrawn
J1375 Not reported 138 100 Solar Active
J1587 Not reported 138 100 Solar Active
J906 Not reported 345 100 Wind Withdrawn
S1081 Surplus; J1375 138 100 Battery Active
S1082 Surplus; J1587 138 50 Battery Active
J1406 Not reported 345 25.2 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first