MISO request J3856

MISO queue ID J3856

Queue request J3856 was listed in the MISO interconnection queue at the end of 2025 as a 235 MW wind project in Wabash County, IL, according to Berkeley Lab’s queue data file. The filing names 08GIBSON (PSI) - 7ALBION as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 1, 2030.

Queue IDJ3856
Project nameNot reported
Status (as published)Active
Substation08GIBSON (PSI) - 7ALBION
Point of interconnection08GIBSON (PSI) - 7ALBION 345.0kV
CountyWabash
StateIL
Voltage345 kV
Capacity235 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2030-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

08GIBSON (PSI) - 7ALBION substation: 2 requests in the MISO queue, 2 active totaling 735 MW.

Queue IDProjectMWResourceStatus
J3076Not reported500HybridActive

Wabash, IL: 2 requests in the MISO queue, 2 active totaling 735 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDUKE ENERGY INDIANA
ClusterDPP Cycle Pending Central
Interconnection serviceNRIS
Project typeGeneration
Queue date2024-12-26

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.