Substation Scout

MISO request J3076

MISO queue ID J3076

Queue request J3076 was listed in the MISO interconnection queue at the end of 2025 as a 500 MW hybrid project in Wabash County, IL, according to Berkeley Lab’s queue data file. The filing names 08GIBSON (PSI) - 7ALBION as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 30, 2025.

Queue IDJ3076
Project nameNot reported
Status (as published)Active
Substation08GIBSON (PSI) - 7ALBION
Point of interconnection08GIBSON (PSI) - 7ALBION 345.0kV
CountyWabash
StateIL
Voltage345 kV
Capacity500 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2025-11-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

08GIBSON (PSI) - 7ALBION substation: 2 requests in the MISO queue, 2 active totaling 735 MW.

Queue IDProjectMWResourceStatus
J3856Not reported235WindActive

Wabash, IL: 2 requests in the MISO queue, 2 active totaling 735 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDUKE ENERGY INDIANA
ClusterDPP-2022 Central
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-15
Components (hybrid)Solar 500 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first