Wabash, IL interconnection queue
2 active projects totaling 735 MW in the MISO queue.
2active projects
735active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3076 | Not reported | 345 | 500 | Hybrid | Active |
| J3856 | Not reported | 345 | 235 | Wind | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.