Queue request J3833 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW wind project in Cass County, ND, according to Berkeley Lab’s queue data file. The filing names Buffalo as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2028.

Queue IDJ3833
Project nameNot reported
Status (as published)Active
SubstationBuffalo
Point of interconnectionBuffalo 115 kV
CountyCass
StateND
Voltage115 kV
Capacity200 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2028-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Buffalo substation: 5 requests in the MISO queue, 1 active totaling 200 MW.

Queue IDProjectMWResourceStatus
J2086Not reported500SolarWithdrawn
J707Not reported300WindWithdrawn
G885Not reported199.5WindWithdrawn
J1961Not reported190WindWithdrawn

Cass, ND: 23 requests in the MISO queue, 8 active totaling 2,281 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOTTER TAIL POWER COMPANY
ClusterDPP Cycle Pending West
Interconnection serviceNRIS
Project typeGeneration
Queue date2024-10-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first