Buffalo substation interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 4 with terminal status (shown grayed).

5 MISO queue filings name Buffalo as the point of interconnection, all in ND.

1active projects
200active MW
5total filed
Queue IDProjectkVMWResourceStatus
J2086 Not reported 345 500 Solar Withdrawn
J707 Not reported 345 300 Wind Withdrawn
J3833 Not reported 115 200 Wind Active
G885 Not reported 345 199.5 Wind Withdrawn
J1961 Not reported 115 190 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.