MISO queue ID J3283

Queue request J3283 was listed in the MISO interconnection queue at the end of 2025 as a 135 MW solar project in Grand Traverse County, MI, according to Berkeley Lab’s queue data file. The filing names KEYSTONE - WEXFORD as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 1, 2028.

Queue IDJ3283
Project nameNot reported
Status (as published)Active
SubstationKEYSTONE - WEXFORD
Point of interconnectionKEYSTONE - WEXFORD 138.0kV
CountyGrand Traverse
StateMI
Voltage138 kV
Capacity135 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2028-11-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

KEYSTONE - WEXFORD substation: 2 requests in the MISO queue, 2 active totaling 335 MW.

Queue IDProjectMWResourceStatus
J4053Not reported200BatteryActive

Grand Traverse, MI: 3 requests in the MISO queue, 2 active totaling 335 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP-2023 East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Study Phase: DPP 1
Queue date2024-04-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first