KEYSTONE - WEXFORD substation interconnection queue

2 active projects totaling 335 MW in the MISO queue.

2 MISO queue filings name KEYSTONE - WEXFORD as the point of interconnection, all in Grand Traverse County, MI.

2active projects
335active MW
2total filed
Queue IDProjectkVMWResourceStatus
J4053 Not reported 138 200 Battery Active
J3283 Not reported 138 135 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.