Substation Scout

Grand Traverse, MI interconnection queue

2 active projects totaling 335 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
335active MW
3total filed
Queue IDProjectkVMWResourceStatus
J1543 Not reported 345 200 Solar Withdrawn
J4053 Not reported 138 200 Battery Active
J3283 Not reported 138 135 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first