MISO request J3280

MISO queue ID J3280

Queue request J3280 was listed in the MISO interconnection queue at the end of 2025 as a 300 MW wind project in Dickey County, ND, according to Berkeley Lab’s queue data file. The filing names Ellendale as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2028.

Queue IDJ3280
Project nameNot reported
Status (as published)Active
SubstationEllendale
Point of interconnectionEllendale
CountyDickey
StateND
VoltageNot reported
Capacity300 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2028-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Ellendale substation: 3 requests in the MISO queue, 1 active totaling 300 MW.

Queue IDProjectMWResourceStatus
J2327Not reported300WindWithdrawn
J1990Not reported250WindWithdrawn

Dickey, ND: 21 requests in the MISO queue, 5 active totaling 960 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMONTANA-DAKOTA UTILITIES CO.
ClusterDPP-2023 West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Study Phase: DPP 1
Queue date2024-04-17

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.