Dickey, ND interconnection queue

5 active projects totaling 960 MW in the MISO queue, plus 16 with terminal status (shown grayed).

5active projects
960active MW
21total filed
Queue IDProjectkVMWResourceStatus
G853 Not reported 230 600 Wind Withdrawn
J509 Not reported n/r 326.9 Gas Withdrawn
J3280 Not reported n/r 300 Wind Active
G690 Not reported 230 200 Wind Withdrawn
G713 Not reported 230 200 Wind Withdrawn
J3667 Not reported n/r 200 Wind Withdrawn
G132 Not reported 230 180 Wind Operational
G221 Not reported n/r 180 Wind Withdrawn
J249 Not reported n/r 180 Wind Operational
G339 Not reported n/r 150 Wind Withdrawn
G359 Not reported 230 150 Wind Withdrawn
G359R Not reported n/r 150 Wind Operational
J098 Not reported 230 150 Wind Withdrawn
J316 Not reported 230 150 Wind Operational
J457 Not reported n/r 150 Wind Withdrawn
G622 Not reported 230 148.8 Wind Withdrawn
G248 Not reported 41.6 19 Wind Withdrawn
G277 Not reported n/r 19 Other Withdrawn
G284 Not reported n/r 19 Wind Withdrawn
G312 Not reported n/r 19 Wind Withdrawn
G313 Not reported n/r 19 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.