MISO request J3251

MISO queue ID J3251

Queue request J3251 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW battery project in Genesee County, MI, according to Berkeley Lab’s queue data file. The filing names THETFORD as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2028.

Queue IDJ3251
Project nameNot reported
Status (as published)Active
SubstationTHETFORD
Point of interconnectionTHETFORD
CountyGenesee
StateMI
VoltageNot reported
Capacity200 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2028-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

THETFORD substation: 3 requests in the MISO queue, 2 active totaling 1,467.9 MW.

Queue IDProjectMWResourceStatus
J3935Not reported1,267.9GasActive
J3267Not reported50SolarWithdrawn

Genesee, MI: 12 requests in the MISO queue, 6 active totaling 1,892.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP-2023 East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Study Phase: DPP 1
Queue date2024-04-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.