THETFORD substation interconnection queue

2 active projects totaling 1,467.9 MW in the MISO queue, plus 1 with terminal status (shown grayed).

3 MISO queue filings name THETFORD as the point of interconnection, all in Genesee County, MI.

2active projects
1,467.9active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3935 Not reported n/r 1,267.9 Gas Active
J3251 Not reported n/r 200 Battery Active
J3267 Not reported n/r 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.