Genesee, MI interconnection queue
6 active projects totaling 1,892.9 MW in the MISO queue, plus 6 with terminal status (shown grayed).
6active projects
1,892.9active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3935 | Not reported | n/r | 1,267.9 | Gas | Active |
| J268 | Not reported | 345 | 801 | Gas | Withdrawn |
| J1654 | Not reported | 345 | 200 | Solar | Withdrawn |
| J3251 | Not reported | n/r | 200 | Battery | Active |
| J1537 | Not reported | 138 | 150 | Solar | Withdrawn |
| J3650 | Not reported | n/r | 150 | Battery | Active |
| J1203 | Not reported | 345 | 125 | Solar | Active |
| J3735 | Not reported | 138 | 100 | Battery | Active |
| J1172 | Not reported | 138 | 50 | Solar | Active |
| J1643 | Not reported | 138 | 50 | Solar | Withdrawn |
| J1660 | Not reported | 345 | 50 | Battery | Withdrawn |
| J3267 | Not reported | n/r | 50 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.