Queue request J3075 was listed in the MISO interconnection queue at the end of 2025 as a 560 MW hybrid project in Sullivan County, IN, according to Berkeley Lab’s queue data file. The filing names Merom Primary - Worthington Primary as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 30, 2025.

Queue IDJ3075
Project nameNot reported
Status (as published)Active
SubstationMerom Primary - Worthington Primary
Point of interconnectionMerom Primary - Worthington Primary 345.0kV
CountySullivan
StateIN
Voltage345 kV
Capacity560 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2025-11-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Merom Primary - Worthington Primary substation: 3 requests in the MISO queue, 3 active totaling 980 MW.

Queue IDProjectMWResourceStatus
J3495Not reported220SolarActive
J2987Not reported200SolarActive

Sullivan, IN: 27 requests in the MISO queue, 20 active totaling 6,576.8 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityHOOSIER ENERGY
ClusterDPP-2022 Central
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-15
Components (hybrid)Solar 560 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first