Substation Scout

Merom Primary - Worthington Primary substation interconnection queue

3 active projects totaling 980 MW in the MISO queue.

3 MISO queue filings name Merom Primary - Worthington Primary as the point of interconnection, all in IN.

3active projects
980active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3075 Not reported 345 560 Hybrid Active
J3495 Not reported 345 220 Solar Active
J2987 Not reported 345 200 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first