Substation Scout

MAJESTIC - ONEIDA substation interconnection queue

2 active projects totaling 655 MW in the MISO queue.

2 MISO queue filings name MAJESTIC - ONEIDA as the point of interconnection, all in MI.

2active projects
655active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3992 Not reported 345 400 Battery Active
J3050 Not reported 345 255 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first