Substation Scout

Sandy Bayou substation interconnection queue

2 active projects totaling 940 MW in the MISO queue.

2 MISO queue filings name Sandy Bayou as the point of interconnection, all in Mississippi County, AR.

2active projects
940active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2696 Not reported n/r 500 Solar Active
J1858 Not reported n/r 440 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first