Substation Scout

MISO request J2602

MISO queue ID J2602

Queue request J2602 was listed in the MISO interconnection queue at the end of 2025 as a 250 MW solar project in Desoto County, MS, according to Berkeley Lab’s queue data file. The filing names Twinkletown as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2026.

Queue IDJ2602
Project nameNot reported
Status (as published)Active
SubstationTwinkletown
Point of interconnectionTwinkletown 230 kV
CountyDesoto
StateMS
Voltage230 kV
Capacity250 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-06-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Twinkletown substation: 2 requests in the MISO queue, 2 active totaling 350 MW.

Queue IDProjectMWResourceStatus
J1748Not reported100SolarActive

Desoto, MS: 8 requests in the MISO queue, 6 active totaling 1,904 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY MISSISSIPPI, LLC.
ClusterDPP-2022 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-14

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first