Substation Scout

Twinkletown substation interconnection queue

2 active projects totaling 350 MW in the MISO queue.

2 MISO queue filings name Twinkletown as the point of interconnection, all in Desoto County, MS.

2active projects
350active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2602 Not reported 230 250 Solar Active
J1748 Not reported 230 100 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first