Desoto, MS interconnection queue

6 active projects totaling 1,904 MW in the MISO queue, plus 2 with terminal status (shown grayed).

6active projects
1,904active MW
8total filed
Queue IDProjectkVMWResourceStatus
J1813 Not reported 230 1,005 Gas Active
J1095 Not reported 230 300 Solar Withdrawn
J2091 Not reported 230 250 Battery Active
J2602 Not reported 230 250 Solar Active
J2047 Not reported 230 199 Solar Active
J1748 Not reported 230 100 Solar Active
J962 Not reported 230 100 Solar Active
J381 Not reported n/r 25 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.