Queue request J2273 was listed in the MISO interconnection queue at the end of 2025 as a 175 MW hybrid project in Clinton County, IL, according to Berkeley Lab’s queue data file. The filing names Tabor as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 31, 2024.

Queue IDJ2273
Project nameNot reported
Status (as published)Active
SubstationTabor
Point of interconnectionTabor
CountyClinton
StateIL
VoltageNot reported
Capacity175 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2024-03-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Tabor substation: 2 requests in the MISO queue, 1 active totaling 175 MW.

Queue IDProjectMWResourceStatus
J3358Not reported100BatteryWithdrawn

Clinton, IL: 2 requests in the MISO queue, 1 active totaling 175 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2021 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2025-07-03
Components (hybrid)Solar 175 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first