Tabor substation interconnection queue

1 active project totaling 175 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Tabor as the point of interconnection, all in IL.

1active projects
175active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2273 Not reported n/r 175 Hybrid Active
J3358 Not reported n/r 100 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.