Substation Scout

Clinton, IL interconnection queue

1 active project totaling 175 MW in the MISO queue, plus 1 with terminal status (shown grayed).

1active projects
175active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2273 Not reported n/r 175 Hybrid Active
J2604 Not reported 138 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first