DELL EHV - SAN SOUCI substation interconnection queue

4 active projects totaling 2,000 MW in the MISO queue.

4 MISO queue filings name DELL EHV - SAN SOUCI as the point of interconnection, all in Mississippi County, AR.

4active projects
2,000active MW
4total filed
Queue IDProjectkVMWResourceStatus
J1897 Not reported 500 500 Hybrid Active
J1899 Not reported 500 500 Hybrid Active
J2190 Not reported 500 500 Hybrid Active
J3401 Not reported 500 500 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.