Queue request J2053 was listed in the MISO interconnection queue at the end of 2025 as a 151.5 MW wind project in Redwood County, MN, according to Berkeley Lab’s queue data file. The filing names Cedar Mountain - Lyon County as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 1, 2025.

Queue IDJ2053
Project nameNot reported
Status (as published)Active
SubstationCedar Mountain - Lyon County
Point of interconnectionCedar Mountain - Lyon County 345.0kV
CountyRedwood
StateMN
Voltage345 kV
Capacity151.5 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2025-08-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cedar Mountain - Lyon County substation: 8 requests in the MISO queue, 7 active totaling 1,756.5 MW.

Queue IDProjectMWResourceStatus
J4072Not reported500BatteryActive
J4152Not reported250SolarActive
J2104Not reported230WindActive
J4151Not reported225SolarActive
J2447Not reported200WindActive
J3704Not reported200BatteryActive
J3705Not reported200WindWithdrawn

Redwood, MN: 15 requests in the MISO queue, 6 active totaling 1,542.5 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityGREAT RIVER ENERGY
ClusterDPP-2021 West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 3; Post GIA Status: Not Started
Queue date2021-08-17

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first