Substation Scout

Cedar Mountain - Lyon County substation interconnection queue

7 active projects totaling 1,756.5 MW in the MISO queue, plus 1 with terminal status (shown grayed).

8 MISO queue filings name Cedar Mountain - Lyon County as the point of interconnection, all in MN.

7active projects
1,756.5active MW
8total filed
Queue IDProjectkVMWResourceStatus
J4072 Not reported 345 500 Battery Active
J4152 Not reported 345 250 Solar Active
J2104 Not reported 345 230 Wind Active
J4151 Not reported 345 225 Solar Active
J2447 Not reported 345 200 Wind Active
J3704 Not reported 345 200 Battery Active
J3705 Not reported 345 200 Wind Withdrawn
J2053 Not reported 345 151.5 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.