Redwood, MN interconnection queue
6 active projects totaling 1,542.5 MW in the MISO queue, plus 9 with terminal status (shown grayed).
6active projects
1,542.5active MW
15total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J4072 | Not reported | 345 | 500 | Battery | Active |
| J1106 | Not reported | 345 | 414 | Wind | Withdrawn |
| J4152 | Not reported | 345 | 250 | Solar | Active |
| J4151 | Not reported | 345 | 225 | Solar | Active |
| J2599 | Not reported | 345 | 216 | Solar | Active |
| J3704 | Not reported | 345 | 200 | Battery | Active |
| J3705 | Not reported | 345 | 200 | Wind | Withdrawn |
| J901 | Not reported | n/r | 200 | Wind | Withdrawn |
| J2053 | Not reported | 345 | 151.5 | Wind | Active |
| J3665 | Not reported | 115 | 100 | Battery | Withdrawn |
| H051 | Not reported | 69 | 40 | Wind | Withdrawn |
| H054 | Not reported | 69 | 40 | Wind | Withdrawn |
| H055 | Not reported | 69 | 40 | Wind | Withdrawn |
| G613 | Not reported | 69 | 17 | Wind | Withdrawn |
| G585 | Not reported | n/r | 8 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.