MISO request J1939

MISO queue ID J1939

Queue request J1939 was listed in the MISO interconnection queue at the end of 2025 as a 125 MW solar project in Saginaw County, MI, according to Berkeley Lab’s queue data file. The filing names CORNELL - LAYTON as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 1, 2023.

Queue IDJ1939
Project nameNot reported
Status (as published)Active
SubstationCORNELL - LAYTON
Point of interconnectionCORNELL - LAYTON 138.0kV
CountySaginaw
StateMI
Voltage138 kV
Capacity125 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2023-11-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

CORNELL - LAYTON substation: 2 requests in the MISO queue, 2 active totaling 375 MW.

Queue IDProjectMWResourceStatus
J3865Not reported250WindActive

Saginaw, MI: 21 requests in the MISO queue, 12 active totaling 2,045.3 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP-2021 East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 3; Post GIA Status: Not Started
Queue date2023-10-18

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.