Substation Scout

CORNELL - LAYTON substation interconnection queue

2 active projects totaling 375 MW in the MISO queue.

2 MISO queue filings name CORNELL - LAYTON as the point of interconnection, all in MI.

2active projects
375active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3865 Not reported 138 250 Wind Active
J1939 Not reported 138 125 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first