MISO request J1863

MISO queue ID J1863

Queue request J1863 was listed in the MISO interconnection queue at the end of 2025 as a 60 MW battery project in Otsego County, MI, according to Berkeley Lab’s queue data file. The filing names Vantyle as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 15, 2024.

Queue IDJ1863
Project nameNot reported
Status (as published)Active
SubstationVantyle
Point of interconnectionVantyle 138kV
CountyOtsego
StateMI
Voltage138 kV
Capacity60 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2024-09-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Vantyle substation: 2 requests in the MISO queue, 2 active totaling 260 MW.

Queue IDProjectMWResourceStatus
J1603Not reported200SolarActive

Otsego, MI: 11 requests in the MISO queue, 5 active totaling 825.7 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP-2021 East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 3; Post GIA Status: Not Started
Queue date2021-08-16

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.