Vantyle substation interconnection queue

2 active projects totaling 260 MW in the MISO queue.

2 MISO queue filings name Vantyle as the point of interconnection, all in Otsego County, MI.

2active projects
260active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1603 Not reported 138 200 Solar Active
J1863 Not reported 138 60 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.