Substation Scout

Otsego, MI interconnection queue

5 active projects totaling 825.7 MW in the MISO queue, plus 6 with terminal status (shown grayed).

5active projects
825.7active MW
11total filed
Queue IDProjectkVMWResourceStatus
J392 Not reported 138 420.7 Gas Operational
J3264 Not reported n/r 300 Battery Withdrawn
J1603 Not reported 138 200 Solar Active
J3416 Not reported n/r 200 Battery Withdrawn
J3134 Not reported n/r 150 Solar Active
J3676 Not reported 138 93 Hybrid Withdrawn
J3637 Not reported 345 90 Gas Withdrawn
J1015 Not reported 138 80 Solar Withdrawn
J1892 Not reported 345 64.8 Solar Withdrawn
J1863 Not reported 138 60 Battery Active
L006 Not reported n/r -5 Other Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.