Substation Scout

GREENWOOD - RAPSON (BANNER) substation interconnection queue

3 active projects totaling 678 MW in the MISO queue.

3 MISO queue filings name GREENWOOD - RAPSON (BANNER) as the point of interconnection, all in Sanilac County, MI.

3active projects
678active MW
3total filed
Queue IDProjectkVMWResourceStatus
J1557 Not reported 345 293 Wind Active
J3633 Not reported 345 200 Solar Active
J1944 Not reported 345 185 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first