Substation Scout

MISO request G752

MISO queue ID G752

Queue request G752 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW wind project in Adams County, ND, according to Berkeley Lab’s queue data file. The filing names Bison - Hettinger as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of September 30, 2009.

Queue IDG752
Project nameNot reported
Status (as published)Operational
SubstationBison - Hettinger
Point of interconnectionBison - Hettinger 230 kV
CountyAdams
StateND
Voltage230 kV
Capacity150 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2009-09-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Bison - Hettinger substation: 2 requests in the MISO queue, 1 active totaling 150 MW.

Queue IDProjectMWResourceStatus
G751Not reported200WindWithdrawn

Adams, ND: 5 requests in the MISO queue, 1 active totaling 150 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2010-APR MT-ND
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2007-02-27
Interconnection agreement date2012-02-07
Operational date2009-09-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first