Bison - Hettinger substation interconnection queue

1 active project totaling 150 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Bison - Hettinger as the point of interconnection, all in Adams County, ND.

1active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatus
G751 Not reported 230 200 Wind Withdrawn
G752 Not reported 230 150 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first